Skip to main content

Industrial Automation Blog

Practical sourcing notes for PLC, DCS, drives, HMIs, sensors, and obsolete spare parts.

Guides for maintenance engineers and procurement teams who need clearer model checks, faster RFQs, and fewer surprises before shipment.

Spare Lead Time Planning After ICS Advisories: Build the Kit Before the Window Jun 29, 2026 · Lead Time & Supply

Spare Lead Time Planning After ICS Advisories: Build the Kit Before the Window

The latest CISA industrial control advisories are useful for a reason beyond cybersecurity. They show how quickly a plant can move from “we should review this” to “we need a maintenance window and a usable spare.” When the affected asset is a controller, relay, gateway, server, or engineering tool, lead time planning becomes part of […]

DCS Spare Parts maintenance kits PLC Spare Parts Read more
EV Charging Spare Lead Times: Controllers, OCPP Gateways, and Field Kits Jun 27, 2026 · Lead Time & Supply

EV Charging Spare Lead Times: Controllers, OCPP Gateways, and Field Kits

The June 25, 2026 CISA advisory for EVoke Systems Charging Station Management System is a useful signal for procurement teams watching the spread of networked EV charging infrastructure. The advisory focuses on CSMS and WebSocket/OCPP-related weaknesses, but the supply-chain lesson is broader. When chargers, gateways, meters, and backend platforms become operationally important, spare lead times […]

charger controller EV charging spares lead time risk Read more
Schneider PowerLogic P7 Advisory: Ranking Relay Spares by Outage Risk Jun 26, 2026 · Lead Time & Supply

Schneider PowerLogic P7 Advisory: Ranking Relay Spares by Outage Risk

CISA’s June 25, 2026 advisory for Schneider Electric PowerLogic P7 should be read by more than cybersecurity teams. The advisory lists vulnerabilities that can affect availability and configuration functionality, and Schneider points users to firmware version V02.004.001. For procurement and reliability teams, the practical issue is lead-time risk: if a protection relay needs firmware work, […]

Electrical Protection lead time risk relay spares Read more
ControlLogix L6x Lead-Time Risk: Which Spares Deserve Priority First Jun 25, 2026 · Lead Time & Supply

ControlLogix L6x Lead-Time Risk: Which Spares Deserve Priority First

For many factories, ControlLogix L6x hardware is no longer a simple reorder item. The platform has been reliable enough to remain installed, but lifecycle status, exact-match availability, and global spare demand make the lead-time question more important in 2026. A purchasing team should not wait for a failed processor or communication card to discover which […]

Allen-Bradley spares ControlLogix L6x lead time risk Read more
B&R Linux-Based Automation: How to Rank Spares by Lead-Time Risk Jun 24, 2026 · Lead Time & Supply

B&R Linux-Based Automation: How to Rank Spares by Lead-Time Risk

CISA’s June 23, 2026 advisory on Linux Kernel vulnerabilities affecting B&R products is not only a cybersecurity note. For global procurement teams, it is also a reminder that automation hardware now depends on operating systems, images, credentials, and access-control policy. When a plant has B&R panel PCs, X20 controllers, edge devices, and motion hardware installed […]

automation supply chain B&R Automation panel PC spares Read more
DAQFactory Advisory Lessons for Spare Lead-Time Priority Jun 23, 2026 · Lead Time & Supply

DAQFactory Advisory Lessons for Spare Lead-Time Priority

CISA’s June 18, 2026 advisory for AzeoTech DAQFactory is not a classic PLC spare-parts bulletin. It concerns data acquisition software and the possibility of arbitrary code execution through malicious files. Yet for a global sourcing team, it points to a familiar operational problem: many plants depend on small engineering PCs, DAQ gateways, interface modules, and […]

automation supply chain DAQFactory engineering workstation Read more