Mitsubishi Electric
Mitsubishi KOJ1-E32DR-C Industrial Network Interface for MELSEC Systems
Mitsubishi KOJ1-E32DR-C CC-Link remote I/O module for MELSEC systems. 32-point relay output, protocol gateway, 12-month warranty. RFQ: zyplc.com
Mitsubishi Electric
Mitsubishi KOJ1-E32DR-C CC-Link remote I/O module for MELSEC systems. 32-point relay output, protocol gateway, 12-month warranty. RFQ: zyplc.com
The Mitsubishi KOJ1-E32DR-C is a high-performance CC-Link remote I/O communication module engineered for seamless integration within MELSEC automation architectures. Designed to serve as a critical node in the industrial data chain, this module bridges field-level devices — including sensors, actuators, and relay-driven output circuits — with upstream PLC controllers, SCADA platforms, and HMI systems. With 32-point relay output capacity and native CC-Link protocol support, the KOJ1-E32DR-C delivers deterministic, low-latency data transmission across distributed control networks, making it an essential component for smart factory deployments where real-time visibility and system reliability are non-negotiable.
In modern industrial environments, the ability to move data reliably from the field to the control room defines operational efficiency. The KOJ1-E32DR-C fulfills this role by acting as a remote I/O station on the CC-Link network, enabling the MELSEC Q-series or L-series master PLC to poll and command field devices without the overhead of point-to-point wiring. This architecture dramatically reduces installation complexity, supports hot-swap maintenance scenarios, and allows engineers to expand I/O capacity without redesigning the control cabinet.
| Parameter | Specification |
|---|---|
| SKU / Part Number | KOJ1-E32DR-C |
| Brand | Mitsubishi Electric |
| Series | MELSEC / AJ65BT / CC-Link Remote I/O |
| Communication Protocol | CC-Link (Control & Communication Link) |
| Interface Type | Remote I/O Station |
| Output Points | 32-Point Relay Output |
| Transmission Speed | Up to 10 Mbps (CC-Link Ver. 1.10) |
| Network Compatibility | MELSEC Q-Series, L-Series, iQ-R PLC Masters |
| System Application | SCADA Integration, HMI Data Acquisition, Remote I/O Expansion |
| Origin | Japan |
| Warranty | 12-Month Warranty |
The KOJ1-E32DR-C operates at the intersection of field instrumentation and supervisory control, forming a vital segment of the plant-wide data loop. In a typical MELSEC-based smart factory, the data journey begins at the sensor layer — proximity switches, photoelectric sensors, and pressure transmitters feed discrete and analog signals into the field network. The KOJ1-E32DR-C collects these signals through its 32-point relay output interface and transmits structured data packets upstream via the CC-Link bus to the MELSEC Q06UDEHCPU or iQ-R series master controller.
From the PLC master, process data flows into the GOT2000 series HMI for operator visualization, while simultaneously being forwarded to the SCADA gateway — often a Mitsubishi MX Component or MX Sheet-enabled PC — for historian logging and alarm management. In multi-zone production lines, the KOJ1-E32DR-C works alongside the AJ65SBTB1-16D input module and the AJ65BT-64AD analog input module, forming a distributed I/O cluster that feeds a unified data stream to the control layer without introducing network bottlenecks.
For drive integration, the CC-Link network also connects to the Mitsubishi FR-A800 series inverter, enabling the PLC to issue speed commands and receive fault feedback in real time. This closed-loop data path — from sensor through the KOJ1-E32DR-C remote I/O station, through the PLC, and out to the FR-A800 drive — exemplifies the kind of deterministic, low-jitter communication that smart factory applications demand. Edge computing nodes, such as the MELIPC MI5122-VW industrial PC, can tap into this data stream for local analytics and predictive maintenance processing before forwarding aggregated insights to cloud-based MES or ERP systems.
When the production line includes safety-rated zones, the KOJ1-E32DR-C integrates alongside the Mitsubishi WS0-GETH10P CC-Link IE Field Network gateway, ensuring that safety I/O data and standard process data remain logically separated while sharing the same physical infrastructure. This architecture supports IEC 61508-compliant safety loops without requiring a parallel wiring harness, reducing both capital expenditure and ongoing maintenance overhead.
One of the most persistent challenges in legacy industrial environments is data isolation — the condition where field devices, PLCs, and supervisory systems operate in silos, unable to share process information in real time. The KOJ1-E32DR-C directly addresses this problem by providing a standardized CC-Link interface that any MELSEC-compatible master can address, regardless of the vintage of the control system. Engineers retrofitting older MELSEC A-series or FX-series installations can introduce the KOJ1-E32DR-C as a remote I/O expansion node, immediately extending the reach of the existing network without replacing the master PLC.
Protocol fragmentation is another common barrier to production line transparency. Sites that mix CC-Link devices with Modbus RTU instruments or PROFIBUS field devices often struggle to consolidate data into a single SCADA view. By positioning the KOJ1-E32DR-C as the CC-Link endpoint for relay-driven outputs, engineers can use a protocol gateway — such as the Anybus X-gateway or a Mitsubishi QJ71PB92V PROFIBUS master module — to bridge the two network domains, feeding unified data into the GX Works3 engineering environment and the GENESIS64 or Wonderware SCADA platform.
Remote diagnostics capability is built into the CC-Link architecture that the KOJ1-E32DR-C supports. Network masters can poll each remote station for communication error counts, station status flags, and output relay health data without interrupting production. This telemetry feeds directly into the SCADA alarm subsystem, enabling maintenance teams to identify degraded stations before they cause unplanned downtime. Combined with the 12-month warranty and pre-shipment functional testing that accompanies every KOJ1-E32DR-C unit from ZYPLC, customers can deploy with confidence knowing that both the hardware and the support infrastructure are in place for long-term operational stability.
System scalability is equally well served by the CC-Link topology. As production capacity grows, additional KOJ1-E32DR-C stations can be added to the network up to the maximum station count supported by the master module, with no changes required to the existing wiring or PLC program structure beyond updating the network parameter table in GX Works3. This plug-and-expand capability makes the KOJ1-E32DR-C a future-proof investment for facilities planning phased automation upgrades.
Q1: What is the maximum communication distance supported by the KOJ1-E32DR-C on a CC-Link network?
A: CC-Link supports transmission distances up to 1,200 meters at 156 kbps. At the maximum speed of 10 Mbps, the cable length is limited to 100 meters per segment. Repeater modules can extend the network reach for larger plant layouts.
Q2: Is the KOJ1-E32DR-C compatible with both MELSEC Q-series and iQ-R series PLC masters?
A: Yes. The KOJ1-E32DR-C conforms to the CC-Link Ver. 1.10 specification and is compatible with any MELSEC CC-Link master module, including the QJ61BT11N for Q-series and the RJ61BT11 for iQ-R series controllers. Station type and occupied station count are configured via rotary switches on the module.
Q3: How does ZYPLC ensure the KOJ1-E32DR-C is functional before shipment?
A: Every KOJ1-E32DR-C unit undergoes pre-shipment functional testing covering communication handshake verification, relay output actuation, and LED status confirmation. Units are shipped with a test report and are covered by a 12-month warranty from the date of delivery.
Q4: Can the KOJ1-E32DR-C be used in a network that also includes CC-Link IE Field devices?
A: The KOJ1-E32DR-C operates on the classic CC-Link (copper coax/twisted pair) network and is not directly compatible with CC-Link IE Field (Ethernet-based). However, a Mitsubishi QJ71GF11-T2 CC-Link IE Field master module combined with a protocol bridge can integrate both network types into a unified SCADA data model.
© 2026 ZYPLC. All rights reserved.
Original Source: https://zyplc.com
Contact: +86 19859288691 | plc.sales@zyplc.com