Lam Research
Lam Research 713-028553-102 Confinement Ring for TPA175D
Lam Research RFQ support for Confinement Ring. Availability, condition, compatibility, lead time, and export shipment options are confirmed before quote.
Lam Research
Lam Research RFQ support for Confinement Ring. Availability, condition, compatibility, lead time, and export shipment options are confirmed before quote.
Technical Details
Review the original product details, compatibility notes, and sourcing information in a clearer technical document layout.
In high-throughput semiconductor fabrication, the integrity of the plasma confinement boundary is not a peripheral concern — it is the architectural foundation upon which etch uniformity, process repeatability, and chamber longevity are built. The Lam Research 713-028553-102 Confinement Ring (cross-referenced as 3161911V01 and 9011496V02) is a precision-engineered plasma boundary component designed specifically for the TPA175D TCP (Transformer-Coupled Plasma) Etch System. Within the layered architecture of a TCP etch platform, this confinement ring occupies a critical position at the plasma process layer, directly governing the spatial distribution of reactive species, ion flux uniformity, and chamber wall interaction dynamics.
The TPA175D platform is a mature, widely deployed etch architecture used across logic, memory, and advanced packaging production lines. Its TCP source design generates a high-density, low-pressure plasma environment that demands precise boundary definition. The 713-028553-102 confinement ring provides that boundary, ensuring that plasma remains confined to the process zone, reducing parasitic deposition on chamber walls, and maintaining the stable etch environment required for sub-micron critical dimension (CD) control. Replacing this component with a non-OEM-equivalent part introduces dimensional variance that propagates through the entire process stack — affecting not only etch rate but also selectivity, profile angle, and endpoint detection reliability.
From a system architecture perspective, the confinement ring does not operate in isolation. It is one node in a tightly coupled assembly that includes the upper electrode assembly, the lower electrode (ESC — electrostatic chuck), the focus ring, the edge ring, the liner assembly, and the gas distribution plate. Each of these components contributes to the overall plasma sheath geometry. When the confinement ring degrades — through erosion, deposition buildup, or dimensional drift — the plasma boundary shifts, and the downstream effect is measurable in wafer-level uniformity data. Proactive replacement of the 713-028553-102 as part of a scheduled preventive maintenance (PM) cycle, coordinated with the replacement of the focus ring (P/N 716-series) and the liner kit, restores the chamber to a baseline state that matches the original process qualification.
The TPA175D system architecture also integrates a match network assembly and RF power delivery subsystem that are sensitive to impedance changes caused by chamber condition drift. A worn confinement ring alters the effective plasma load seen by the match network, causing increased reflected power, match instability, and potential arc events. Maintaining the 713-028553-102 within its qualified dimensional tolerance directly supports RF system stability and reduces unplanned downtime associated with match network faults. This interdependency between the mechanical process kit and the RF architecture is a key reason why OEM-equivalent replacement parts — with verified dimensional and material specifications — are essential for sustaining process control.
Beyond the plasma process layer, the TPA175D architecture includes a wafer handling and transfer module, a vacuum system (turbomolecular pump and backing pump assembly), and a gas delivery manifold with mass flow controllers (MFCs). The confinement ring’s role in maintaining chamber pressure uniformity is directly linked to the vacuum system’s ability to achieve and sustain the target base pressure. A compromised confinement ring can introduce virtual leaks or alter conductance paths within the chamber, increasing pump-down time and affecting the accuracy of pressure-based process endpoints. Coordinating the replacement of the 713-028553-102 with a chamber vent and pump-down cycle, followed by a leak check and process qualification run, ensures that the vacuum architecture is fully restored before production wafers are processed.
For facilities managing multiple TPA175D chambers — a common configuration in high-volume manufacturing (HVM) environments — maintaining a qualified spare inventory of the 713-028553-102 is a standard practice. Chamber-to-chamber matching, a critical requirement for process portability across a fab, depends on all chambers operating with process kit components within the same dimensional specification window. A single chamber running with an out-of-spec confinement ring introduces a matching offset that requires additional process engineering effort to compensate. Stocking verified OEM-equivalent 713-028553-102 units ensures that PM cycles across all chambers can be executed consistently, without introducing matching variance.
This component is supplied with a 12-Month Warranty covering dimensional conformance, material integrity, and fit-form-function equivalence to the original Lam Research specification. Each unit undergoes inspection prior to shipment to verify that critical dimensions — including inner diameter, outer diameter, thickness, and surface finish — are within the qualified tolerance range. system integration support is available to assist engineering teams with installation sequencing, PM documentation, and chamber qualification protocols specific to the TPA175D platform.
| Part Number | 713-028553-102 |
| Cross Reference | 3161911V01 / 9011496V02 |
| Component Type | Confinement Ring (Plasma Boundary Component) |
| System Role | Plasma spatial confinement, chamber boundary definition, etch uniformity control |
| Compatible Platform | Lam Research TPA175D TCP Etch System |
| Process Application | Dielectric etch, conductor etch, advanced patterning |
| Material | Quartz / Anodized Aluminum (OEM-equivalent, per platform specification) |
| Installation Environment | High-vacuum process chamber, cleanroom Class 10 / ISO 4 compatible |
| RF Compatibility | Compatible with TCP RF source and bias RF subsystem of TPA175D architecture |
| Pressure Range | Compatible with TPA175D operating pressure range (mTorr to low Torr) |
| Warranty | 12-Month Warranty — dimensional conformance, material integrity, fit-form-function |
| system integration | PM sequencing, chamber qualification, and installation support available |
| Origin | United States |
| Availability | In stock — global shipping supported |
The 713-028553-102 confinement ring achieves its full performance potential only when installed within a correctly configured and maintained TPA175D chamber assembly. The following components represent the primary architectural neighbors of the confinement ring within the TCP etch system:
The Lam Research TPA175D TCP Etch System, equipped with the 713-028553-102 confinement ring, is deployed across a broad range of semiconductor manufacturing environments:
Q1: Is the 713-028553-102 compatible with all TPA175D chamber configurations, and does it require any modification for installation in chambers with upgraded RF systems?
The 713-028553-102 is designed to the original TPA175D chamber specification and is compatible with standard chamber configurations as qualified by Lam Research. For chambers that have undergone RF system upgrades or hardware modifications, it is recommended to verify dimensional compatibility with the current chamber configuration before installation. Our system integration support team can assist with compatibility assessment and installation documentation for modified chamber configurations. The 12-Month Warranty covers fit-form-function equivalence to the original OEM specification.
Q2: What is the recommended replacement interval for the 713-028553-102, and how should its replacement be coordinated with other PM activities?
The replacement interval for the confinement ring is typically defined by the chamber’s PM schedule, which is based on RF hours, wafer count, or process-specific erosion rate data. In most HVM environments, the confinement ring is replaced every 250–500 RF hours, coordinated with the focus ring, edge ring, and liner assembly replacement. Post-installation, a chamber qualification run — including a leak check, pump-down verification, and process qualification wafer — should be completed before returning the chamber to production. Our team can provide PM sequencing documentation specific to the TPA175D platform.
Q3: What does the 12-Month Warranty cover, and what is the process for warranty claims if a dimensional non-conformance is identified after installation?
The 12-Month Warranty covers dimensional conformance to the original Lam Research specification, material integrity (including surface finish and chemical purity where applicable), and fit-form-function equivalence. If a dimensional non-conformance or material defect is identified after installation, please contact our support team with the part number, installation date, and a description of the observed non-conformance. We will initiate a replacement or credit process promptly. Pre-installation dimensional inspection using calibrated measurement tools is recommended as a best practice to verify conformance before the component is installed in the chamber.
© 2026 ZYPLC. All rights reserved.
Original Source: https://zyplc.com
Contact: +86 19859288691 | plc.sales@zyplc.com